Pier
2 is located south of Ponta da Madeira. It is built
in a north-northeast direction and planned to handle
vessel with a maximum of 155,000 dwt. The structure
of Pier is a reinforced concrete platform 280 meters
long and 24,8 meters wide, supported by missed sheathed
concrete piles of lost mold type.
There
is a mooring dolphins on the northern side, 26 meters
away from the platform and set back from to the docking
alignment.
The
shiloading rolling track is installed on the platform.
01
- Draft restriction
18,00 meters.
02
- Length restriction
280,00 meters.
03
- Beam restriction
31,50 meters.
04
-Air Draft restriction
18,00 meters.
05
- Available Shore Equipments
01 linear shiploader, with a conveyor belt of 1.800
mm.
06
- Operated cargo
|
Produtc
|
Operation
|
|
Iron
Ore
|
Exportation
|
|
Manganese
Ore
|
Exportation
|
|
Pig
iron
|
Exportation
|
|
Soya
|
Exportation
|
 |
07
- Water supply
Water is supplied up to the limit of 200 tons per vessel,
with flow ranging from 20 to 40 tons/hour. There are
water outlets of 2½" of diameter.
08
- Bunker supply
It is allowed through outlets, during the loading operation
of vessels. However, CVRD gives itself the right of
not allowing simultaneous bunkering with loading, when
they find it dangerous.
09
- Ballasting
CVRD terminal does not have facilities for unboarding
sewage waters, dejects or contaminated materials..
10
- Loading rate
|
Product
|
Operation
|
Shape
|
Rate
|
|
Iron
ore
|
Loading
|
Bulk
|
8.000
tons/hora
|
|
Manganese
Ore
|
Loading
|
Bulk
|
8.000
tons/hora
|
|
Pig
iron
|
Loading
|
Bulk
|
8.000
tons/hora
|
|
Soya
|
Loading
|
Bulk
|
8.000
tons/hora
|
 |
Note.:
The informed rates in this table are nominated. So,
they can undergo any change according to vessel's type
and condition, as well as, the type and condition of
holds.
11
- Work schedule
SHINC
E-mail
|